Bathrooms in Leigh
Bathroom Fitting & Installation across Leigh (WN7), ten minutes from our base in Atherton.
Bathrooms for Leigh Homes
A Leigh bathroom is usually a small room asked to do more: a bath pulled out for a walk-in shower in a Westleigh terrace, an ensuite squeezed from a box room in the Pennington semis, a downstairs wet room put in where the stairs have got hard to manage. The terraces off Plank Lane and Firs Lane leave almost no floor to work with, so we set the layout on paper before a single fitting is ordered.
The real job is usually behind the tiles. Leigh sits low and canal-threaded, its solid-brick terraces running damp off spent slate courses, and plenty of these bathrooms were tiled straight onto a wet wall by the last fitter. We find all that at strip-out, tank or line the cold external walls the Higher Folds and interwar stock are known for, and plan the extraction so the condensation these rooms breed has a way out rather than blackening a corner.
Get a Free Quote 07812 075990What We See on Leigh Bathrooms
- Tiles bonded straight onto a wet Westleigh terrace wall
- Bath swapped for a walk-in shower in tight terraces
- Ensuite carved from a Pennington box room
- Cold external walls tanked before the new tiling
- Black mould in the corner where extraction never coped
A Leigh bathroom holds up when the damp in the wall is beaten before the first tile, not after. We come and look over the whole room, then a written quote, usually within 48 hours.
Where We Cover in Leigh
Leigh built itself on cotton, silk and coal, and the housing still maps onto that history. Long brick terraces fan out through Westleigh and off Firs Lane, built tight for mill and pit families. Between the wars the semis arrived around Pennington and Beech Hill, then the big estates like Higher Folds followed after the war. The newest chapter is the modern developments going up around the Sports Village and along the old railway land.
The terraces are classic damp territory: solid brick, spent slate damp courses, cellars under some of the older rows, and a canal-threaded, low-lying town that keeps ground moisture topped up. The interwar and council stock runs cold on outside walls and breeds condensation. The new builds mostly need finishing work: skims, boards and the settlement cracks of their first few years.
We work right across Leigh, including Pennington, Westleigh, Plank Lane and Higher Folds, and out into the surrounding towns.
Postcodes we cover: WN7.
For the full rundown on how we do it, see our bathroom fitting & installation page, or everything we offer locally on our Leigh page.
Bathrooms Questions
The whole room. Rip-out, plumbing, electrics, damp and rot repairs, boarding, tanking, plastering, the suite and the tiling, coordinated as one job with one written quote. The plastering and damp side is where we start, because that is what most bathrooms need fixing in the first place.
It depends on the size of the room, the suite you choose and what the walls and floor are hiding, so we quote from a look round rather than a photo. The written quote breaks out the suite, the tiling and the building work so you can adjust the spec to suit the budget.
Yes, both run within the job. The plumbing and electrical work is carried out by qualified trades and certified as the regulations require, and any gas work is done by a Gas Safe registered engineer. Nothing gets tiled or boxed in until it has been signed off.
Other Work We Do in Leigh
Plastering
Skims, re-skims, boarding and making good, finished flat and ready for paint.
→
Skimming
Walls and ceilings taken back to smooth, over old plaster, fresh board or tired paint.
→
Damp Proofing
Rising damp found, treated and replastered, with the readings taken first.
→
Mould Treatment
Black mould dealt with at the cause: cold walls warmed, surfaces treated and refinished.
→
Plasterboarding
Ceilings, stud walls and dot and dab, boarded straight and skimmed as one job.
→
Artex Removal
Swirled ceilings skimmed flat, overboarded or removed, done the safe way.
→
Renovations
Full internal refurbishments from strip-out to decoration-ready, run by one firm.
→
Kitchens
Full kitchen installations, from strip-out to worktops on, run by one firm.
→
Joinery
First and second fix carpentry: studwork, doors, skirting, floors and fitted storage.
→
Plumbing
First and second fix plumbing for bathrooms, kitchens and refurbishments.
→
Electrics
Rewires, sockets, lighting and consumer units as part of our refurbishment work.
→